Project Name: | Philippine SCBP Power Engineering Project Transportation |
Consingor: | Wuxi XX power equipment co. LTD |
Transportation time: | Dec,2016-Jan,2017 |
Description: | This project is to build a power plant for the island of Gros, Philippines. The goods include: steel structure, loading vehicles, major pieces of equipment, etc., the goods total 14,000 billable tons, charter transport. |
Task: | 1: The island of Gros is relatively remote. The largest port is BACOLOD PORT. The owner's site is nearly 200 kilometers away from the BACOLOD terminal. The port facilities of BACOLOD are relatively backward. The project is also transported from DDU to the door, in order to meet the customer's construction period. As well as the shipowner's requirements for the unloading rate, the goods can only be unloaded and unloaded directly to the set cards and low plates that we have prepared. It requires us to prepare enough cards and low flatbeds in advance. 2: After the cargo arrived at BACOLOD, there is a SOC box. Due to the poor condition of the customer's box source, the center of gravity of the cargo is seriously uneven. When the crane is lifted, the container is deformed. After the heavy duty of the ship on the dock of our company, the truck is dumped. The goods are unloaded on truck |